Plaza / Official / C0010
Climbing House With Climbing Ramp
OfficialC0010QUADRO website: From 3 yrs

Climbing House With Climbing Ramp

QUADRO
QUADROOfficial

This official model takes 219 parts, covers 235 × 213 cm, stands 186 cm tall and goes together in 23 steps. The full parts list, step-by-step instructions and the sets that build it are below.

Footprint
235 × 213 cm (5.0 ㎡)
Height
186 cm
Climbable height
80 cm
Parts
219
Manual steps
23

A factory model, not a recommendation. Judge height, span and rails for your home.

Parts list for Climbing House With Climbing Ramp

PartCodeQty
Space 5-wayCS52
Space 4-wayCS418
Surface 4-wayCF41
Space 3-wayCS315
Surface 3-wayCF319
ElbowCS211
StraightCF212
45°C458
Tube 15 cmT152
Tube 25 cmT254
Tube 35 cmT35111
Panel 40×40 cmPA49
Tube core 80 cmRV84
Roof1
Fabric sheet2
Total219

Step-by-step instructions: 23 steps

Build from the bottom up, level by level: first the connectors and tubes of a level, then the uprights to the next one, and panels and fabric once the frame stands. Follow along in 3D →

  1. Step 1 · Level 1: connectors and tubes on the floorSpace 4-way× 1Space 3-way× 9Surface 3-way× 10Elbow× 9Tube 25 cm× 3Tube 35 cm× 27
  2. Step 2 · Uprights up to level 2Tube 35 cm× 17
  3. Step 3 · Level 2: connectors and tubes 3 cm up45°× 2
  4. Step 4 · Uprights up to level 3Tube 35 cm× 2Tube core 80 cm× 1
  5. Step 5 · Level 3: connectors and tubes 31 cm upSurface 3-way× 2Tube 35 cm× 1
  6. Step 6 · Uprights up to level 4Tube 35 cm× 2Tube core 80 cm× 1
  7. Step 7 · Level 4: connectors and tubes 40 cm upSpace 4-way× 6Space 3-way× 4Surface 3-way× 2Elbow× 2Straight× 3Tube 35 cm× 12
  8. Step 8 · Uprights up to level 5Tube 35 cm× 11
  9. Step 9 · Level 5: connectors and tubes 60 cm upSurface 3-way× 2Tube 35 cm× 1
  10. Step 10 · Uprights up to level 6Tube 35 cm× 2Tube core 80 cm× 1
  11. Step 11 · Level 6: connectors and tubes 80 cm upSpace 5-way× 2Space 4-way× 7Surface 4-way× 1Surface 3-way× 1Tube 25 cm× 1Tube 35 cm× 12
  12. Step 12 · Uprights up to level 7Tube 35 cm× 6
  13. Step 13 · Level 7: connectors and tubes 88 cm up45°× 2
  14. Step 14 · Level 8: connectors and tubes 120 cm upSpace 4-way× 4Surface 3-way× 2Straight× 4Tube 15 cm× 2Tube 35 cm× 8
  15. Step 15 · Level 9: connectors and tubes 123 cm up45°× 4
  16. Step 16 · Uprights up to level 10Tube 35 cm× 4
  17. Step 17 · Level 10: connectors and tubes 152 cm upStraight× 4
  18. Step 18 · Uprights up to level 11Tube 35 cm× 4
  19. Step 19 · Level 11: connectors and tubes 181 cm upSpace 3-way× 2Straight× 1Tube 35 cm× 2Roof× 1
  20. Step 20 · Level 4: panels and fabricPanel 40×40 cm× 4
  21. Step 21 · Level 6: panels and fabricPanel 40×40 cm× 3
  22. Step 22 · Level 8: panels and fabricPanel 40×40 cm× 2Fabric sheet× 2
  23. Step 23 · Finishing: fit the remaining connectors and tube coresTube core 80 cm× 1

Which set builds it

No single QUADRO set is enough on its own.

All setsIdeas by age and spaceParts guideAll official models